PROJECTS

PALM OIL Storage AND DISTRIBUTION FACILITIY

  • Designed palm oil storage and distribution facility

  • Provided responsibility for the design Detailed Engineering phase

  • Delivered detailed facility engineering, hydraulics, P&IDs and PFDs

  • Led design reviews meetings

  • Coordinated various project disciplines

  • Developed Control Narrative and Shut Down Keys

LIQUID PIPELINES – VARIOUS PROJECTS

  • Provided technical direction on process-related inputs, evaluations, and recommendations for new and ongoing projects, focusing on operability, reliability, and optimization.

  • Performed steady-state hydraulic analyses to identify bottlenecks and optimize system performance across multiple Enbridge facilities.

  • Optimized drag-reducing agent (DRA) injection rates by balancing product vapor pressure and flow conditions to enhance efficiency and throughput.

  • Led Management of Change (MOC) processes, ensuring technical integrity and compliance with corporate standards.

  • Increased pipeline throughput by refining the relationship between operating pressure profiles, pressure alarms, and PSV set points.

  • Mentored and supported junior engineers in process design, hydraulic modeling, and operational troubleshooting.

BRINE POND DETAILED ENGINEERING

  • Designed brine, raw water, natural gas, and instrument air systems required for the Brine Pond 6 project including brine pumps, brine pond leak detection pumps, sump pumps; associated miscellaneous equipment

  • Provided responsibility for the design Detailed Engineering phase

  • Delivered detailed facility engineering, hydraulics, P&IDs and PFDs

  • Led design reviews meetings

  • Coordinated various project disciplines

  • Developed Control Narrative and Shut Down Keys

RELIEF SYSTEM UPGRADES/CONTROL&SAFETY SYSTEMS UPGRADES

RELIEF SYSTEM UPGRADES/CONTROL&SAFETY SYSTEMS UPGRADES

  • Optimized relief networks to comply with applicable regulations and standards

  • Improved reliability of ammonia storage tanks and refrigeration systems

  • Implemented upgrades for control and safety systems to improve overall facility reliability

  • Participated in HAZOP and LOPA meetings


Interested in starting a project? Feel free to contact us for more information.